Hospitality

DRNP

Nusa Penida, Bali

Project Coordinator
Samuel Bonaventura

Project Architects
Indra Wira Sasmita

Site Area
7.840 m2

Building Area
1.033 m2

Landscape Consultant
Bali Landscape Company

Structure Consultant
ANSCON Consultant & Engineering

MEP Consultant
Hardian Solusi Engineering

QS Consultant
Simetris Consulting

Drafter
Ilham Gusti Syahadat

Creating a dive resort included with a dive center in the heart of Penida Island. The final masterplan design has a really flowy and soulful arrangement to the building mass and circulation. Instead of only relishing on the natural view, there are also interesting visual and spatial elements to explore. An integration between tropical vibes and modern concept are poured in this resort as well.